Chapter 30 Permit Application

FIGURES APPENDICES
Figure 1 - Project SIte Location Map
Appendix A - Permit Application Forms
                      A-1 WPDEX General Permit Application Form
                      A-2 Dredge Permit Application Form
Figure 2 - Sediment Accumulation in Shoreline Areas
Appendix B - Draft Environmental Assessment
Figure 3 - Sediment Sample Locations and Dredge Areas
Appendix C - WDNR Correspondence
                      C-1 WDNR Letter to Mr. Steven Dischler (6/1/06)
                      C-2 Foth Letter to Mr. Craig Helker (6/21/06)
                      C-3 Foth Letter to Ms. Geri Radermacher (11/19/07)
Figure 4 - 2007 Survey Transect Locations and
                 Dredge Areas
Appendix D - Restoration Plans for Dredge Locations
Figure 5A - West Channel (South) Dredge Prism
Appendix E - Project Cost Analysis
Figure 5B - West Channel (South) Water Depth
Appendix F - 2006 Sediment Sample Collection Procedures and
                     Sediment Probe Logs
Figure 6A - West Channel (North) Dredge Prism
Appendix G - 2006 Sediment Sample Supplemental Test Results
                      G-1 Pesticides
                      G-2 Arsenic, Copper, Lead, and Zinc
Figure 6B - West Channel (North) Water Depth
Appendix H - Listing of Affected Riparian Owners
Figure 7A - Northwest Channels (South) Dredge Prism
Appendix I - Property Notifications/Agreements
                     I-1 Affected Riparian Owners Notification Letter
                     I-2 Dewatering Site Acceptance Letter from the City
                         of Delafield
                     I-3 Lang and Lake Country Land, LLC Property
                         Easement Agreement
                     I-4 Riparian Property Easement Agreements
Figure 7B - Northwest Channels (South) Water Depth
Appendix J - Aquatic Plant and Water Depth Survey
Figure 8A - Northwest Channels (Central) Dredge Prism
Appendix K - 2007 Dredge Alignment Transect Survey
Figure 8B - Northwest Channels (Central) Water Depth
Appendix L - Design Calculations
                      L-1 Sedimentation Trap Design Calculations
                      L-2 Process Design Calculations and Dewatering
                             Pad Pump Sizing Calculations
                      L-3 Geotextile Strength Calculations
                      L-4 Geotextile Dewatering Tube Sizing Calculations
Figure 9A - Northwest Channels (North) Dredge Prism
Appendix M - Dredge Contingency and Spill Prevention Plan
Figure 9B - Northwest Channels (North) Water Depth
Appendix N - Dredging Specifications
Figure 10A - Northeast Channels Dredge Prism
Appendix O - City's Proposed Dredge Plans to DNR
Figure 10B - Northeast Channels Water Depth
 
Figure 11A - Bark River Inlet Dredge Prism
 
Figure 11B - Bark River Inlet Water Depth
 
Figure 12A - Zastrow's Bay (North) Dredge Prism
 
Figure 12B - Zastrow's Bay (North) Water Depth
 
Figure 13A - Zastrow's Bay (South) Dredge Prism
 
Figure 13B - Zastrow's Bay (South) Water Depth
 
Figure 14 - Sediment Slurry Pipe Alignment
 
Figure 15 - Shoreline Staging Area
 
Figure 16 - Slurry Pipe Alignment and Sediment
                   Management Site
 
Figure 17 - Sediment Management Site
 
Figure 18 - Sediment Development Details
 
Figure 19 - Site Development Details
 
Figure 20 - Dredging Operation Details
 
Figure 21 - Groundwater Contours
 
Figure 22 - Overall Project Timeline